Townmore Housing, Tullamore | KORE Case Study
KORE case studies offer an inside look at how our EPS solutions perform in real-world applications.
The following case study is a 62-unit development in Tullamore, Co Offaly, using The KORE Insulated Foundation System
Why Townmore built off the KORE Insulated Foundation System, and chose to do it again.
Project Name: Daingean Road, Tullamore
Developer: Townmore Construction
Products Used: KORE’s Insulated Foundation System
KORE Representatives: Jonathan Malone & Pauric Booth
A Word from our Site Support Specialist
“Our job on the first phase was to work alongside the BM Lynch crew and the Townmore Site Team until the installation process became second nature. Once they had the processes and sequences locked in, they were running the system independently, plot after plot. That’s what makes it work on a 62-unit scheme.”
-
Radon laid out pre KORE Insulated Foundation System Install -
Mid Pour on KORE Insulated Foundation System -
Mid Pour on KORE Insulated Foundation System -
Aerial View | Post Pour on KORE Insulated Foundation System
From Evaluation to Adoption: Why Townmore chose to use the KORE Insulated Foundation System, and chose to use it again
Townmore Construction chose the KORE Insulated Foundation System for its Daingean Road development in Tullamore, a 62-home scheme of detached, semi-detached and multi-unit homes. Construction Director Seamus Quirke and Commercial Director Kevin Flynn wanted to improve efficiency, reduce site complexity and speed up delivery without compromising quality.
After a series of technical meetings with KORE, the Townmore team assessed the system not just as insulation but as an alternative to traditional foundation build-ups. What stood out was the opportunity to eliminate multiple foundation stages, reduce reliance on scarce blocklaying resources, minimise excavation and create a faster route to finished floor level.
“We looked at the programme, the costs and the practicalities on site. We could see clear advantages in terms of speed, site management and removing trades that can be difficult to resource. We got great buy-in from the site team.
Once everyone understood the process and saw the advantages of simplifying the journey to floor level, the benefits became very clear.
The biggest value was the time saved for our management team. Instead of constantly managing multiple trades to get to ground floor level, they could focus on the wider project and the next stages of construction. When you consider the reduction in site management time, labour input and programme duration, the system contributed to a more cost-effective and efficient project delivery overall.”
– Seamus Quirke, Construction Director, Townmore Construction
Project Overview: Townmore Construction’s 62-Unit Development in Tullamore
Client: Townmore Construction
Location: Daingean Road, Tullamore, Co. Offaly
Development Size: 62 Residential Units
House Types: Detached, Semi-Detached, Blocks of 4 Units and Blocks of 5 Units
Wall Construction: Cygnum Timber Frame with Masonry Outer Leaf
System Supplied: KORE Insulated Foundation System
Engineering: DFK Engineering (on behalf of KORE)
Key Benefits
- Part L & BCAR Compliant
- Cost Effective
- Reduced Embodied Carbon
- Reduced Labour & Time
- Suited to Ground Conditions
Project Objectives: Avoiding Unnecessary Excavation on Stabilised Ground
Before Townmore took ownership of the site, extensive enabling works had already addressed poor ground conditions, around two metres of unsuitable material was excavated and replaced with stabilised engineered fill, creating a robust formation level across the development.
That raised an obvious question: did it make sense to excavate back through newly stabilised ground just to build traditional strip foundations? Townmore’s objectives became:
- Eliminate unnecessary excavation works
- Reduce material handling and waste removal
- Minimise reliance on specialist blocklaying trades
- Accelerate the journey to finished floor level
- Create a repeatable process suitable for a 62-unit development
The Solution: How the KORE Insulated Foundation System Suited the Site’s Ground Conditions
KORE supplied our Insulated Foundation System, engineered to build directly off the prepared formation level rather than through it. Working alongside BM Lynch as groundworks and installation contractor, the project adopted a build-up that removed several traditional substructure stages in one move.
KORE’s Site Support Specialist, Pauric Booth, worked directly with the installation team through the first phase on site, providing hands-on guidance until the crew could run the system independently across all 62 units.
Three factors drove Townmore’s decision, according to Construction Director, Seamus Quirke:
- Reduced excavation, building from formation level avoided further digging and disposal
- Reduced dependence on blockwork trades, cutting reliance on increasingly scarce blocklaying labour
- Programme efficiency, a faster, more certain route to finished floor level across dozens of units running in parallel
Technical Detail: The KORE Insulated Foundation Installation Sequence
The installation process followed a consistent, repeatable sequence across the development:
- Preparation of the drainage layer
- Service and drainage coordination
- Radon barrier installation
- Placement of the KORE Foundation System
- Sequenced progression through to floor installation
Engineering and certification: DFK Engineering, working on behalf of KORE, delivered the structural design, compliance assessment and final sign-off for the development, giving Townmore a single point of responsibility across specification, engineering and site delivery.
“You have to get into a production line approach. Once everything is sequenced correctly and continuously moving, you can flow through the development and get your foundations completed quickly and efficiently.”
– Seamus Quirke
Programme & Delivery Benefits: A Production-Line Approach to Foundations
As the project progressed, Townmore developed a workflow that mirrored a factory-style production line: groundworks teams moved ahead preparing drainage and services, radon installation followed, foundation crews completed the KORE system, and floor construction flowed straight in behind.
- Faster foundation delivery
- Improved programme certainty
- Reduced trade coordination requirements
- Consistent installation quality across all 62 units
- Greater efficiency for site management teams
On-Site Advantages of the KORE Insulated Foundation System
- Reduced excavation and disposal works
- Elimination of multiple traditional foundation stages
- Reduced reliance on scarce blocklaying resources
- Faster path to finished floor level and superstructure installation
- Site management time redirected to higher-value, critical-path activities
Value Beyond the Foundation: Time Saved for Site Management
While the speed of foundation installation was a key benefit, Townmore identified another advantage that was equally important.
Time.
By simplifying the process to reach finished floor level, the project management team could focus their attention on higher-value activities across the development.
Instead of managing multiple substructure trades, overseeing excavation works and coordinating blockwork operations, site management resources could be redirected towards timber frame installation, roofing, masonry works and other critical path activities.
“The biggest value was the time saved for our management team. Instead of constantly managing multiple trades to get to ground floor level, they could focus on the wider project and the next stages of construction.”
– Seamus Quirke
For a contractor delivering dozens of units simultaneously, this operational efficiency proved highly valuable.
Why This Project Matters for Large-Scale Housing Delivery
Demonstrates system flexibility. Delivered successfully beneath a timber frame and masonry outer leaf superstructure at scale, showing KORE’s system adapting to Townmore’s chosen build methodology.
Enables scalable housing delivery. A repeatable, production-line process across 62 units proves the system’s suitability for large multi-unit developments, not just individual homes.
Builds genuine site buy-in. “We got great buy-in from the site team. Once everyone understood the process and saw the advantages of simplifying the journey to floor level, the benefits became very clear.” – Seamus Quirke
Converts into repeat business. Following Daingean Road, Townmore adopted the KORE system on a 91-unit development in Midleton, Co. Cork, and has progressed plans for a further 66-unit phase on an adjacent site, validation earned through real project performance, not a single trial.
PHOTOS OF WORKS IN PROGRESS
Jonathan Malone
Sales Manager
“The best endorsement any system can get is a contractor coming back for the next project. Townmore have now chosen KORE for their 91-unit development in Midleton, and plans for a further 66-unit development. We’re looking forward to building on what we achieved together at Daingean Road.”
– Jonathan Malone, Sales Manager, KORE Insulation